Projects

Case Study: Access Control Upgrade – Arjo Huntleigh, Belfast

  • Client: Arjo Huntleigh
  • Location:Belfast
  • Project Scope: Building-wide Access Control system
  • Sector: Industrial
  • Systems Installed: Access Control – Paxton
  • Project Completion/Duration: August 2024 – 1 month

Project Overview

Arjo Huntleigh appointed Atlas World to upgrade and extend the Paxton access control system across their Belfast facility. The project aimed to replace ageing hardware, improve system reliability, and provide additional functionality to enhance security management and operational flexibility.
Works were conducted on a live industrial site, requiring careful planning to avoid disruption to client operations while ensuring all security measures remained fully operational.

Upgrade and extension of the access control system across the facility, providing enhanced security, flexibility, and ease of use for client operations.

System Design & Components

The upgraded system was designed to integrate seamlessly with existing infrastructure while providing enhanced usability.

Key elements included:

Paxton Access Control System – new controllers and door entry hardware installed across the building.

Front-end Management Software – upgraded for simplified user administration, access permissions, and reporting.

System configured for scalability, allowing future expansion or integration with other security systems if required.

Arjo Access Control Upgrade
Arjo Access Control Upgrade

Challenges Faced

• Working on a live client site while maintaining secure access and preventing downtime.
• Upgrading and extending the system without interfering with ongoing operations.
• Ensuring compatibility with existing hardware and software to avoid disruption to users.

Approach & Coordination

Atlas World liaised closely with onsite management and residents to schedule works efficiently.

Installation was planned to minimise disruption, with all cabling and hardware carefully routed to maintain site tidiness.

System testing and commissioning were carried out in stages, ensuring all cameras were fully operational before handover.

Outcome

Atlas World coordinated closely with the client’s site management to schedule installation during low-traffic periods and minimise operational impact.

Testing and commissioning were carried out in stages, with live verification of all doors, access points, and software functionality before handover.

Compliance Focus

All works were carried out in accordance with:
BS EN 60839-11-1:2013 – Access Control Systems – System Requirements
BS 8243:2010 – Security Systems for Buildings – Access Control

Atlas World’s engineers ensured full testing, certification, and documentation, providing long-term compliance and security assurance for the client.

Atlas World
Fire Alarm
AMR